Work Completed

CLIENT

LOCATION

DESCRIPTION

ACTIVITY

TONNAGE

Alprom /

CPP

Richardsbay

Cathode Sealing Plant

Installed and Commissioned Furnaces

Conveyors, Overhead Cranes, Ladle

Pre-Heaters, Ladles and Hydraulics

168




Paste Heating Plant

Installed and Commissioned Furnaces,

Crusher, Hydraulics and structure

60



Reduction Services Building

Installed 4km Pressure Piping To ASMEIX


ABB Feralin

Richardsbay

Material Handling

Erected Bolted Gantries, Installed Mechanicals and Commissioned

460

LHPC

Lesotho

Tunnel Lining Equipment

Assembled and Installed Collapsible Tunnel Lining Shutters, Assembled, Commissioned and Installed Traveler, Underground

95


Suidwes KO-OP

Viljoenskroon

Refurbished Oil-mill

Modified Extractor, Installed Cooker and steam Piping under shut down conditions


ERGO

Springs

Heat Exchanger

Tubed Heat Exchanger


Gencor Eng Tech

Pietersburg

MFSBE No 1&2

Installed, conveyor, Platforms and Slipping Devices under shut down conditions

60

Samancor


Bag house Ducting

Stripped old Ducting and replaced with new ducting including Modifications at 30m

30


Middelburg Ferro-chrome

Building Strengthening Project

Stiffened existing building, stripped and replaced with new existing Crane Girders (was 20t now 65t) partially under shut-down conditions

180

Caltex

Cape Town

Cooling Tower

Erected, painted and commissioned 4 cell cooling tower, piping to ASME IX

28

Hamon SA

West Drie #9

Pre-Cooler and Condenser

Cladding 1,600 m2 and modifications.


Castor & Ladder

Spartan

Warehouse

Erection of Warehouse.

38

Ambient

Germiston

Warehouse

Erection of Warehouse.


65

SIS

Middelburg

Conveyor Gantries

Fabricated and erected Conveyer Gantries on site.

22

EHI

Spartan

Warehouse

Erection of Warehouse.

12

Flex-O-Pac

Amalgam

Plastic Extruder

Fabricated support structure Installed and commissioned machine.

7

Polifin

Sasolburg

Cooling Tower

Erected and commissioned 3 cell cooling tower.

17

Ultimate Aircraft

Krugersdorp

A/C Hangar

Fabricated and Erected & clad hangar on site.

9

Umgeni Water

Amamzimtoti

O/land pipeline

Fabricated excavated & installed pipe work

12km

Ewethu Breweries

Midrand

Whiskey distillation plant

SS316 dairy tubing Cooling water system, moving & upgrading distillery


Bateman

Attridgeville

Sewer line

Manholes excavate, install


Rand Water

Kempton

Water Line

Collars 1500dia

32km

Frazer Alexander

Crown Mine

Ongoing maintenance



Beatrix


Penstock

Penstock pipe


Grootvlei


Ring main


3km

Kynock

AEL

Pump barge

Design, install and commission


Zincor


PVC pipe



Thackwray

Krugersdorp

Ceramic factory

Install and maintain kilns dryers. Batching plants maintenance and installation


RPM

Rustenburg

Steeple jacking 180m stack



MTN

Middleberg

Install guy ropes

Cell Tower mods / maintenance


Flex o Pack


Plastic extrusion and converting

Plant move and upgrade


Mega Milling

Ventersdorp

Plant upgrade

Manufactured and installed bucket and screw conveyers


Sappi Enstra

Springs

Cooling towers

Plant shut down maintenance


Sappi

Ingodwana

Cooling towers

Plant shut down maintenance


Sasol 1

Sasol


Cooling tower erection & piping


Isis Ice Cream

Johanesberg

Ice cream factory

Complete Plant installation & piping


JNB International airport


Satin finish

Departure hall cosmetic stainless steel


Price Waterhouse Coopers

Santon

Decorative stainless steel

Canteen and bar areas


Comnet

Harmony


Stainless titration m/c


Von Wielligh

Johannesberg


Jewellery manufacturing facility


Covent Plant

Johannesberg


Move & commissioning


Fraser Alexander

Diepkloof

Ring main raising


2.8


Crown/ Rustenburg

Pipe fabrication

Step in, Berm drains, Repairs, Salvage,



Vaal reefs

Penstock sealing





Mechanical Maint

Hydraulic Guns



Crown

Pipe laying

Reticulation



Rustenburg

Slurry line

Recover 450 nb sandblast sa 2,5 primer int final. install

6.8km



Reclaiming Pipe


6,8km


Knights

Residue Line

Install with all sets and spools

26km


Cc




Crown

Penstocks

In slimes dam




Ringmains

Piping on the top of slimes dam

40


Rooikraal

Slurry Feed


1.8



Ringmain

Piping on the top of slimes dam

3.8


ERPM

Slurry feed


6



Ringmain


2



Step in


1.2


Cullinan

Barge





R and D




Grootvlei

Ringmain


3.2



Slurry feed line

In nature reserve, wetland

12



Paddock piping


2


Zincor

Barge

HDPE submerged line

1.2






RPM

Spigot line

Stripped out and painted the line in the dam

12km


Implats

UG2

Installed HDPE lined line under shut conditions

4.8


De Beers

Lime Batching Plant

Design fabricate and commission complete plant



Crown

Slurry line

Install slurry feed line 500nb

6.2

Anglo Gold Ashanti

West Wits

Stripped out and replaced pipeline.

350nb Fully galvanised pipe.

5.8km

Durban Roodepoort Deep Ergo Gold Recoveries Recommisioned Plant. Slurry and Water lines 500nb Flanged, rubber lined slurry lines. 500nb Welded water line. API 1104.
450nb High Pressure ring-main welded.
500nb In-dam ring-main HDPE.
51km
19km
5.5km
12km

 

 
 
Client
Location
Description
Activity
Tonnage