CLIENT |
LOCATION |
DESCRIPTION |
ACTIVITY |
TONNAGE |
Alprom /
CPP |
Richardsbay |
Cathode Sealing Plant |
Installed and Commissioned Furnaces
Conveyors, Overhead Cranes, Ladle
Pre-Heaters, Ladles and Hydraulics |
168
|
|
|
Paste Heating Plant |
Installed and Commissioned Furnaces,
Crusher, Hydraulics and structure |
60 |
|
|
Reduction Services Building |
Installed 4km Pressure Piping To ASMEIX |
|
ABB Feralin |
Richardsbay |
Material Handling |
Erected Bolted Gantries, Installed Mechanicals and Commissioned |
460 |
LHPC |
Lesotho |
Tunnel Lining Equipment |
Assembled and Installed Collapsible Tunnel Lining Shutters, Assembled, Commissioned and Installed Traveler, Underground |
95
|
Suidwes KO-OP |
Viljoenskroon |
Refurbished Oil-mill |
Modified Extractor, Installed Cooker and steam Piping under shut down conditions |
|
ERGO |
Springs |
Heat Exchanger |
Tubed Heat Exchanger |
|
Gencor Eng Tech |
Pietersburg |
MFSBE No 1&2 |
Installed, conveyor, Platforms and Slipping Devices under shut down conditions |
60 |
Samancor |
|
Bag house Ducting |
Stripped old Ducting and replaced with new ducting including Modifications at 30m |
30 |
|
Middelburg Ferro-chrome |
Building Strengthening Project |
Stiffened existing building, stripped and replaced with new existing Crane Girders (was 20t now 65t) partially under shut-down conditions |
180 |
Caltex |
Cape Town |
Cooling Tower |
Erected, painted and commissioned 4 cell cooling tower, piping to ASME IX |
28 |
Hamon SA |
West Drie #9 |
Pre-Cooler and Condenser |
Cladding 1,600 m2 and modifications. |
|
Castor & Ladder |
Spartan |
Warehouse |
Erection of Warehouse. |
38 |
Ambient |
Germiston |
Warehouse |
Erection of Warehouse.
|
65 |
SIS |
Middelburg |
Conveyor Gantries |
Fabricated and erected Conveyer Gantries on site. |
22 |
EHI |
Spartan |
Warehouse |
Erection of Warehouse. |
12 |
Flex-O-Pac |
Amalgam |
Plastic Extruder |
Fabricated support structure Installed and commissioned machine. |
7 |
Polifin |
Sasolburg |
Cooling Tower |
Erected and commissioned 3 cell cooling tower. |
17 |
Ultimate Aircraft |
Krugersdorp |
A/C Hangar |
Fabricated and Erected & clad hangar on site. |
9 |
Umgeni Water |
Amamzimtoti |
O/land pipeline |
Fabricated excavated & installed pipe work |
12km |
Ewethu Breweries |
Midrand |
Whiskey distillation plant |
SS316 dairy tubing Cooling water system, moving & upgrading distillery |
|
Bateman |
Attridgeville |
Sewer line |
Manholes excavate, install |
|
Rand Water |
Kempton |
Water Line |
Collars 1500dia |
32km |
Frazer Alexander |
Crown Mine |
Ongoing maintenance |
|
|
Beatrix |
|
Penstock |
Penstock pipe |
|
Grootvlei |
|
Ring main |
|
3km |
Kynock |
AEL |
Pump barge |
Design, install and commission |
|
Zincor |
|
PVC pipe |
|
|
Thackwray |
Krugersdorp |
Ceramic factory |
Install and maintain kilns dryers. Batching plants maintenance and installation |
|
RPM |
Rustenburg |
Steeple jacking 180m stack |
|
|
MTN |
Middleberg |
Install guy ropes |
Cell Tower mods / maintenance |
|
Flex o Pack |
|
Plastic extrusion and converting |
Plant move and upgrade |
|
Mega Milling |
Ventersdorp |
Plant upgrade |
Manufactured and installed bucket and screw conveyers |
|
Sappi Enstra |
Springs |
Cooling towers |
Plant shut down maintenance |
|
Sappi |
Ingodwana |
Cooling towers |
Plant shut down maintenance |
|
Sasol 1 |
Sasol |
|
Cooling tower erection & piping |
|
Isis Ice Cream |
Johanesberg |
Ice cream factory |
Complete Plant installation & piping |
|
JNB International airport |
|
Satin finish |
Departure hall cosmetic stainless steel |
|
Price Waterhouse Coopers |
Santon |
Decorative stainless steel |
Canteen and bar areas |
|
Comnet |
Harmony |
|
Stainless titration m/c |
|
Von Wielligh |
Johannesberg |
|
Jewellery manufacturing facility |
|
Covent Plant |
Johannesberg |
|
Move & commissioning |
|
Fraser Alexander |
Diepkloof |
Ring main raising |
|
2.8 |
|
Crown/ Rustenburg |
Pipe fabrication |
Step in, Berm drains, Repairs, Salvage, |
|
|
Vaal reefs |
Penstock sealing |
|
|
|
|
Mechanical Maint |
Hydraulic Guns |
|
|
Crown |
Pipe laying |
Reticulation |
|
|
Rustenburg |
Slurry line |
Recover 450 nb sandblast sa 2,5 primer int final. install |
6.8km |
|
|
Reclaiming Pipe |
|
6,8km |
|
Knights |
Residue Line |
Install with all sets and spools |
26km |
|
Cc |
|
|
|
Crown |
Penstocks |
In slimes dam |
|
|
|
Ringmains |
Piping on the top of slimes dam |
40 |
|
Rooikraal |
Slurry Feed |
|
1.8 |
|
|
Ringmain |
Piping on the top of slimes dam |
3.8 |
|
ERPM |
Slurry feed |
|
6 |
|
|
Ringmain |
|
2 |
|
|
Step in |
|
1.2 |
|
Cullinan |
Barge |
|
|
|
|
R and D |
|
|
|
Grootvlei |
Ringmain |
|
3.2 |
|
|
Slurry feed line |
In nature reserve, wetland |
12 |
|
|
Paddock piping |
|
2 |
|
Zincor |
Barge |
HDPE submerged line |
1.2 |
|
|
|
|
|
RPM |
Spigot line |
Stripped out and painted the line in the dam |
12km |
|
Implats |
UG2 |
Installed HDPE lined line under shut conditions |
4.8 |
|
De Beers |
Lime Batching Plant |
Design fabricate and commission complete plant |
|
|
Crown |
Slurry line |
Install slurry feed line 500nb |
6.2 |
Anglo Gold Ashanti
|
West Wits
|
Stripped out and replaced pipeline.
|
350nb Fully galvanised pipe.
|
5.8km
|
Durban Roodepoort Deep |
Ergo Gold Recoveries |
Recommisioned Plant. Slurry and Water lines |
500nb Flanged, rubber lined slurry lines. 500nb Welded water line. API 1104.
450nb High Pressure ring-main welded.
500nb In-dam ring-main HDPE. |
51km
19km
5.5km
12km |